Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 24-Southampton & Rockledge to FTC at Cottman Av - FS on Central Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1h04 - 1h17 Mins
at . Waiting 31:53. 21:46 behind Vehicle 3172 Load 279%? Gloria Dei Bethayres

2: 1h18 - 1h22 Mins
at . 0:13 ahead of Vehicle 3187 Load 28%? Fox Chase

Construction Started Apr 26 Until Jun 1
Mon - Fri, until 4pm on 6/1/24, NB via Oxford Ave, bear right at (Shop Rite to, stay on Oxford Ave), Left on Knorr St, Right on Rising Sun Ave, Reg Rt
Construction Started Apr 17 Until Jun 1
Mon - Fri, until 4pm on 6/1/24, SB via Rising Sun Ave, Left on Knorr St, Right on Oxford Ave, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.