Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 26-FTC to Chelten Av Station at Olney Square - 1 Conway going Pulaski-Rittenhouse

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 - 14 Mins
at . 0:05 ahead of Vehicle 8623 In long layover, last seen 14:52

2: 47 - 1h10 Mins
at . 2:39 behind Vehicle 8541

Construction Started Sun Sep 15 Until Mon Oct 7
until 4pm on 10/7/24, EB via Bustleton Ave, Right on Bridge St, Left on Penn St, Left on into Pratt St Alley, drop off on the Route R and, Rt 8 stand in front of the, Supervisor Booth
Danella Construction Started Wed Sep 11 Until Fri Oct 11
7am -4pm Mon -Fri until, 10-11-24,, EB via Pratt L-Horrocks,, Right on Bridge, Right on Saul, Left on Pratt -, Reg Rt.,, PULL OUTS TO FTC
Construction Started Wed Sep 18 Until Fri Oct 11
7 am to 5pm until 10-11-24, EB via Algon, Right on Unruh, Right on Frontenac, Left on Magee, Reg Rt
Construction Started Tue Sep 3 Until Fri Oct 11
Frankford Trans Ctr Trips, Weekday 7am to 7pm until, 10-11-24, WB via Magee, Right on Frontenac, Left on Unruh, Left on Algon, Reg Rt

Vehicle 8559 aprchg Frankford Transit Center - Main Dropoff heading South

Vehicle 8623 at Front St on Olney Av heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.