Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 29-Pier 70 to 33rd-Dickinson at 28th St on Morris St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:22 - 2 Mins
at . Waiting 11:18. 1:01:39 behind Vehicle 3585 Load 76%? Empty Pier 70

2: 20 - 21 Mins
at . 0:49 ahead of Vehicle 3527 Load 93%? Pier 70 Last seen 1:13

3: 51 Mins
at . 0:00 behind Vehicle 3551 Load 154%? Pier 70 Last seen 1:01

4: 1h00 - 1h21 Mins
at . Waiting 11:18. 1:05:18 behind Vehicle 3585 Load 76%? Pier 70

Construction Started Apr 30 Until May 3
6:30am - 4:00pm until 5/3/24, WB via Tasker, Left on Broad, Right on Passyunk, Right on Snyder, Right on Vare To Layover Point
Loop Reconstruction Started Apr 21 Until Dec 31 2024
Until 12am on 1-1-25, WB via Tasker St, Right on 34th St, Take recovery on 34th St, Btwn Dickinson St & Tasker, St
Loop Reconstruction Started Apr 21 Until Dec 31 2024
Until 12am on 1-1-25, EB via 34th St, Right on Dickinson St, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.