Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 3-33rd-Cecil B. Moore to FTC at Venango St on Kensington Av going Frankford Transportation Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 20 - 23 Mins
at . 3:34 behind Vehicle 3140 Load 121%? Empty

2: 37 - 43 Mins
at . 1:29 behind Vehicle 8471 Load 92%?

3: 1h03 - 1h11 Mins
at . 10:17 behind Vehicle 3169 Load 143%?

4: 1h14 - 1h25 Mins
at . 3:48 behind Vehicle 3348 Load 59%?

Sink Hole Started Fri Aug 2 Until Fri Sep 27
7am - 7pm, Mon - Fri until 9-/27/24, WB via Front, Right on Susquehanna, Left on 2nd, Right on Berks, Reg Rt
Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, EB via Bridge St, Left on Penn St, Left on into the busway, drop off, passengers on the Route R, stand
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 3519 at Dyre St on Frankford Av heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.