Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 3-33rd-Cecil B. Moore to FTC at 19th St on Cecil B Moore Av going Frankford Transportation Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 23 - 26 Mins
at . 1:07 ahead of Vehicle 3163 Load 96%? Last seen 1:17

2: 52 - 55 Mins
at . 0:25 ahead of Vehicle 3145 Load 106%? Last seen 1:15

3: 1h08 - 1h15 Mins
at . 1:01 behind Vehicle 3286 Load 59%? In long layover, last seen 2:30

Sink Hole Started Fri Aug 2 Until Fri Sep 27
7am - 7pm, Mon - Fri until 9-/27/24, WB via Front, Right on Susquehanna, Left on 2nd, Right on Berks, Reg Rt
Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, EB via Bridge St, Left on Penn St, Left on into the busway, drop off, passengers on the Route R, stand
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.