Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 32-Broad-Carpenter to Ridge-Lyceum at Cumberland St on 33rd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 6 Mins
at . 5:42 behind Vehicle 8617 Load 152%? Few Seats Available Ridge-Lyceum

2: 27 - 33 Mins
at . 5:30 behind Vehicle 8622 Load 161%? Many Seats Available Ridge-Lyceum

3: 57 - 1h03 Mins
at . 5:30 behind Vehicle 8243 Load 120%? Ridge-Lyceum

4: 1h25 - 1h32 Mins
at . 5:18 behind Vehicle 8270 Load 119%? Ridge-Lyceum

Construction Started May 13 Until May 18
7:00pm to 5:00am on 5-13-, 24 to 5-18-24, SB via Logan Square, Right on Ben Franklin Parkway, Right on 17th Street, Left on Market St., Reg. rt.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.