Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 32-Broad-Carpenter to Ridge-Lyceum at 20th St - MBNS on Winter St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 Mins
at . 0:47 behind Vehicle 8243 Load 101%? Broad-Carpenter

2: 30 - 33 Mins
at . 2:36 behind Vehicle 8270 Load 109%? Broad-Carpenter

3: 57 - 1h02 Mins
at . 1:01 behind Vehicle 8640 Load 114%? Broad-Carpenter

4: 1h27 - 1h32 Mins
at . 1:07 behind Vehicle 8617 Load 120%? Broad-Carpenter

Construction Started May 13 Until May 18
7:00pm to 5:00am on 5-13-, 24 to 5-18-24, SB via Logan Square, Right on Ben Franklin Parkway, Right on 17th Street, Left on Market St., Reg. rt.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.