Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 45-Broad & Oregon to Noble & 12th at Pine St on 11th St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 7 Mins
at . 12:37 behind Vehicle 3111 Load 135%? Empty Noble-12th

2: 42 - 47 Mins
at . 1:07 behind Vehicle 3436 Load 160%? Noble-12th

3: 1h20 - 1h24 Mins
at . 13:12 behind Vehicle 3111 Load 144%? Noble-12th

PECO Utility Work Started Until
Until 1:00AM, NB via 11th, Left on Vine, Left on 12th, Layover on 12th St, Rg Rte
Construction Started Apr 25 Until Dec 30 2024
until 12/31/24, SB discontinued transit stop, 12th & Locust.
Construction Started Oct 17 2022 Until Jun 30 2025
until 6/30/25, SB near side transit stop, discontinued at 12th & Vine., Board passengers SB far, side stop 12th & Vine at the, layover until further notice.
Street Construction Started Sep 27 2023 Until Jun 30 2025
Until 1159pm on 06-30-2025, NB via 11th Street, Left on Callowhill St, Left on 12th, Recover on 12th in cutout, btwn Vine St East and, Vine St West for SB service, Reg Rt
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 12:53 a.m. Tuesday, April 30th. Started Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 12:53 a.m. Tuesday, April 30th.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.