Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 52-49th-Wdland to 54th-City/50th-PrkSd at Lebanon Av on 54th St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 - 23 Mins
at . Waiting 16:21. 8:00 behind Vehicle 3386 Load 88%? Empty 49th-Woodland

2: 32 - 36 Mins
at . 0:39 behind Vehicle 3048 Load 76%? 49th-Woodland

3: 1h02 - 1h05 Mins
at . 0:01 behind Vehicle 3395 Load 98%? 49th-Woodland

Construction Started Apr 15 Until Jul 1
24/7 until 7-1-24, NB via 54th, Right on Overbrook, Left on Bryn Mawr, Left on City, Left on 54th, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.