Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 52-49th-Wdland to 54th-City/50th-PrkSd at Montgomery Av on 54th St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 11 - 17 Mins
at . 3:07 behind Vehicle 3057 Load 209%? Vehicle Full 54th-City

2: 24 - 36 Mins
at . 4:39 behind Vehicle 8390 Load 138%? 54th-City

3: 37 - 50 Mins
at . 2:40 behind Vehicle 8139 Load 109%? 54th-City

4: 52 - 1h05 Mins
at . 1:46 behind Vehicle 8423 Load 117%? 54th-City

5: 1h08 - 1h20 Mins
at . 3:01 behind Vehicle 3026 Load 135%? 54th-City

Construction Started Apr 15 Until Jul 1
24/7 until 7-1-24, NB via 54th, Right on Overbrook, Left on Bryn Mawr, Left on City, Left on 54th, Reg Rt
Trip cancellation for trip 737622.
Trip cancellation for trip 737622.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.