Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 52-49th-Wdland to 54th-City/50th-PrkSd at 50th St on Woodland Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 Mins
at . Waiting 8:32. 3:02 behind Vehicle 8390 Load 223%? 54th-City Via Park West Town Center

2: 18 - 28 Mins
at . 14:10 behind Vehicle 8139 Load 193%? 54th-City

3: 23 - 32 Mins
at . 8:28 behind Vehicle 8423 Load 52%? 54th-City

4: 27 - 38 Mins
at . 0:48 ahead of Vehicle 3026 Load 31%? 54th-City

5: 45 - 53 Mins
at . Waiting 8:54. 2:06 behind Vehicle 3052 Load 124%? 54th-City

Construction Started Apr 15 Until Jul 1
24/7 until 7-1-24, NB via 54th, Right on Overbrook, Left on Bryn Mawr, Left on City, Left on 54th, Reg Rt
Trip cancellation for trip 737616.
Trip cancellation for trip 737616.
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 6:46 p.m. today. Started Apr 28 Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 6:46 p.m. today.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.