Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 57-WhitmanPlaza to RisingSun-Olney&FTC at Spring Garden St on 3rd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 16 - 19 Mins
at . 6:04 behind Vehicle 8447 Load 213%? Fern Rock Transportation Center

2: 30 - 40 Mins
at . 4:41 behind Vehicle 3566 Load 93%? Rising Sun-Olney

3: 49 - 56 Mins
at . 2:55 behind Vehicle 8535 Load 91%? Fern Rock Transportation Center

4: 1h10 - 1h15 Mins
at . 3:25 behind Vehicle 3095 Load 105%? Rising Sun-Olney

Construction Started Apr 23 Until Apr 30
Weekdays 8am -4:30pm, until 4/30/24, SB via Front, Right on Grange, Left on 2nd, Left on Chew, Right on Front, Reg Rt
Construction Started Apr 23 Until Apr 30
Weekdays 8am -4:30pm, until 4/30/24, NB via Front, Left on Chew, Right on Mascher, Right on Grange, Left on Front, Reg Rt
Construction Started Apr 4 Until May 26
Weekday 6am to 4:00pm, until 5-26-2024, SB via Moyamensing Ave, Left on Snyder Ave, Right on Swanson, Right on Oregon Ave, Reg Rt
Construction Started Apr 4 Until May 26
Weekday 6am to 9pm until, 5-26-2024, Marine Terminal Trips, SB via Moyamensing Ave, Left on Snyder Ave, Right on Swanson, Left on Oregon Ave, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.