Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 64-50th-Parkside to Pier 70 at Parkside Loop on 50th going Columbus Blvd Pier 70

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 11 Mins
at . 0:06 behind Vehicle 3530 Load 97%? In long layover, last seen 5:55

2: 22 - 29 Mins
at . 0:01 behind Vehicle 3437 Load 91%? Last seen 1:03

3: 36 - 44 Mins
at . 0:05 behind Vehicle 3551 Load 86%? Last seen 1:06

4: 1h17 - 1h21 Mins
at . 6:07 behind Vehicle 3593 Load 217%? Last seen 1:04

Contractors Started Until
until 6:00 pm on 9-23-24, EB via 48th, Left on Larchwood, Right on 47th, Right on Baltimore, Reg rt
Contractors Started Until
until 6:00 pm on 9-23-24, WB via Baltimore, Left on 47th, Left on Pine, Right on 48th, Reg rt
Construction Started Tue Aug 20 Until Wed Jan 1
Until 1/1/25, Discontinued Transit Stop, @ 22nd & Washington, Westbound

Vehicle 3530 past Parkside Loop on 50th heading West

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.