Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 65-Germantown-Chelten to 69th St TC at Merion Rd on City Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:37 - 3 Mins
at . 0:46 behind Vehicle 3387 Load 126%? Few Seats Available 69th Street Transportation Center

2: 12 Mins
at . 1:05 ahead of Vehicle 3652 Load 119%? Few Seats Available 69th Street Transportation Center

3: 33 Mins
at . 7:07 behind Vehicle 8385 Load 155%? 69th Street Transportation Center

4: 38 Mins
at . 0:00 behind Vehicle 3665 Load 38%? 69th Street Transportation Center Last seen 1:09

5: 55 Mins
at . 5:20 behind Vehicle 3644 Load 133%? 69th Street Transportation Center Last seen 1:13

Construction Started Until
Until 4pm on 4-16-24, SB via Chelten Ave, Right on Greene, Left on Rittenhouse, Right on Wayne Ave, Reg Rt
Construction Started May 16 Until
Until 5pm on Thur 5/16/24, NB via Lancaster Ave, Right on City Ave, Reg Rt
Construction Started May 16 Until
Until 5pm on Thur 5/16/24, SB via City Ave, Left on Lancaster Ave, Right on 63rd St, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.