Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 7-Pier 70 to 33rd-Dauphin at Lombard St on 23rd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 - 8 Mins
at . 0:44 behind Vehicle 3109 Load 213%? Empty Pier 70

2: 19 - 27 Mins
at . 1:10 behind Vehicle 3569 Load 176%? Many Seats Available Pier 70 Last seen 1:00

3: 33 - 40 Mins
at . 0:33 behind Vehicle 3589 Load 90%? Many Seats Available Pier 70

4: 1h02 - 1h13 Mins
at . 11:48 behind Vehicle 3437 Load 215%? Pier 70

Street & Construction Started May 6 Until May 10
Week days only on 5-6-24, to 5-10-24 6:30am to, 4:00pm, SB via 23rd, Right on Washington Ave, Left on 24th, Left on Snyder, Right on 23rd, Reg. rt.
Construction Started Apr 28 Until May 31
24/7 unitl 5-31-24, NB via 27th, Left on Poplar, Right on 29th, Reg Rt
Penn Dot Started Jul 30 2023 Until Dec 31 2025
The transit stops located at, 23rd & Market discontinued, until further notice due to, construction
Trip cancellation for trip 745275.
Trip cancellation for trip 745275.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.