Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 7-Pier 70 to 33rd-Dauphin at Lombard St on 22nd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 - 11 Mins
at . 1:16 behind Vehicle 3589 Load 83%? Few Seats Available 33rd-Dauphin Last seen 1:29

2: 30 - 39 Mins
at . 7:49 behind Vehicle 3437 Load 85%? Empty 33rd-Dauphin

3: 42 - 50 Mins
at . Waiting 10:57. 1:52 behind Vehicle 3574 Load 65%? Empty 33rd-Dauphin

4: 1h00 - 1h17 Mins
at . 4:02 behind Vehicle 3566 Load 89%? 33rd-Dauphin

5: 1h23 - 1h39 Mins
at . 9:53 behind Vehicle 3100 Load 105%? 33rd-Dauphin

Street & Construction Started Until May 10
Week days only on 5-6-24, to 5-10-24 6:30am to, 4:00pm, SB via 23rd, Right on Washington Ave, Left on 24th, Left on Snyder, Right on 23rd, Reg. rt.
Construction Started Apr 28 Until May 31
24/7 unitl 5-31-24, NB via 27th, Left on Poplar, Right on 29th, Reg Rt
Penn Dot Started Jul 30 2023 Until Dec 31 2025
The transit stops located at, 23rd & Market discontinued, until further notice due to, construction
Trip cancellation for trip 745310.
Trip cancellation for trip 745310.
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 2:59 p.m. today. Started Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 2:59 p.m. today.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.