Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : L-ChestnutHill/PlymouthMtgMall to OTC at 17 th St on Nedro Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 - 4 Mins
at . 4:12 behind Vehicle 8601 Load 118%? Empty Plymouth Meeting Mall

2: 14 - 29 Mins
at . 10:06 behind Vehicle 8267 Load 169%? Erdenheim

3: 22 - 28 Mins
at . 1:06 ahead of Vehicle 8283 Load 38%? Plymouth Meeting Mall

4: 58 - 1h03 Mins
at . 5:19 behind Vehicle 8613 Load 364%? Plymouth Meeting Mall

5: 1h11 - 1h28 Mins
at . 14:46 behind Vehicle 3340 Load 244%? Erdenheim

Street Construction Started Mar 15 Until Mar 15 2027
Until 5pm on 3-15-2027, SB via Wister, Left on Chelten, Right on 21th, Left on Nedro, Reg Rt
Street Construction Started Mar 15 Until Mar 15 2027
Until 5pm on 3-15-2027, NB via Nedro Ave, Right on 21st, Left on Chelten, Right on Wister, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.