Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : XH-Broad-Erie to Cheltenham-Ogontz-XH at Ogontz Av Loop on Cheltenham Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 - 17 Mins
at . 0:05 ahead of Vehicle 8271 Load 100%? Broad-Erie

2: 46 - 1h01 Mins
at . 1:05 behind Vehicle 8236 Load 62%? Broad-Erie In long layover, last seen 16:32

3: 1h05 - 1h19 Mins
at . 2:22 behind Vehicle 8638 Load 31%? Express Broad-Erie

Street Construction Started Until
7am to 3 pm until 9-23 -24, NB via Greene, Left on Maplewood, Right on Wayne Ave, Right on Chelten Ave, Left on Greene, Reg Rt
Construction Started Wed Sep 18 Until Tue Sep 24
11am -3pm until 9-24-24, SB via Washington Lane, Left on Ardlehigh, Right on Haines, Right on Chew Ave, Left on Washington Lane, Reg Rt
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 8236 at Germantown Av on Butler St heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.