Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:21 Mins
at . 0:19 behind Vehicle 3791.4336.1542.9599.7844.6697.1374.8840 Load 96%? Platform 2 Leppington Last seen 1:07

2: 3 Mins
at . 2:25 behind Vehicle 7451 Load 7%? Platform 2 Leppington In long layover, last seen 58:18

3: 29 - 32 Mins
at . 0:35 ahead of Vehicle 2424.7214.4288.4566.3827.1706.1551.1275 Load 90%? Many Seats Platform 2 Leppington

4: 34 Mins
at . 3:07 behind Vehicle 9229 Load 12%? Platform 2 Leppington In long layover, last seen 27:36

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Vehicle 5638 aprchg Leppington Station heading West

Vehicle 9229 aprchg Schofields Station heading North

Vehicle 7451 aprchg Schofields Station heading North

Vehicle 6971 aprchg Leppington Station heading West

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.