Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T9-Northern Line at Waverton Station going Gordon

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 Mins
at . 1:35 ahead of Vehicle 7272.2212.2902.4803.2495.2290.7589.9665 Load 94%? Platform 2

2: 24 Mins
at . 2:32 behind Vehicle 8168.4387.4253.1546.3897.5070.6892.5148 Load 127%? Platform 2

3: 37 Mins
at . 0:24 behind Vehicle 8626.3191.7839.5172.3514.7395.9571.6926 Load 86%? Platform 2

4: 51 Mins
at . 0:00 behind Vehicle 1523.2753.6559.1452.7573.8742.2758.5458 Load 97%? Platform 2

5: 1h06 Mins
at . 0:00 behind Vehicle 2469.6641.2148.5543.3099.4680.2873.9249 Load 100%? Platform 2

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.