Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : R5-Hastings St at Main St on Eastbound E Hastings St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 14 Mins
at . 2:18 behind Vehicle 23013 Load 123%? R5 Hastings St/To Sfu Exchange

2: 20 - 34 Mins
at . 7:34 behind Vehicle 22006 Load 144%? R5 Hastings St/To Sfu Exchange Last seen 1:28

3: 32 - 36 Mins
at . 3:12 behind Vehicle 19033 Load 64%? R5 Hastings St/To Sfu Exchange Last seen 1:06

4: 43 - 48 Mins
at . 3:12 behind Vehicle 19030 Load 100%? R5 Hastings St/To Sfu Exchange Last seen 1:26

5: 55 - 1h00 Mins
at . 2:08 behind Vehicle 19041 Load 91%? R5 Hastings St/To Sfu Exchange Last seen 1:32

R5 Hastings St to Burrard Station detour beginning Mon May 6. Regular route to Howe & Dunsmuir then continue Howe, Georgia, Burrard to temporary terminus northbound Burrard @ Dunsmuir. Starts May 6
New temporary terminus for R5 during construction:

50530 northbound Burrard St @ Dunsmuir St.
R5 Hastings St to Burrard Station detour from Wed May 8 to Mon May 13 from 6:00 AM to 12:00 PM daily. Regular route to Hastings and Richards, via Richards, Pender, Howe, resume regular route due to traffic. Starts May 8 Until May 13
Cruise Ship Traffic

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.