Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 22-Knight/Downtown at E 41 Ave on Southbound Knight St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 Mins
at . 5:53 behind Vehicle 18333 Load 140%? 22 Knight

2: 15 Mins
at . 1:42 ahead of Vehicle 18311 Load 47%? 22 Knight

3: 25 Mins
at . 2:25 ahead of Vehicle 18340 Load 86%? 22 Knight

4: 36 Mins
at . 1:26 ahead of Vehicle 18360 Load 77%? 22 Knight Last seen 1:02

5: 46 - 56 Mins
at . 5:01 behind Vehicle 18354 Load 146%? 22 Knight to 63rd

Stop 51275 Eastbound Terminal Ave @ Western St is temporarily closed through Sun Sep 29 due to construction. Started Wed Sep 11 Until Mon Sep 30
Affected routes:
22
22 Downtown detour from Mon Sep 23 through Thu Sep 26. Regular route to Clark and Venables, via Clark, Hastings, Gore, Pender, resume regular route due to road block. Started Until Fri Sep 27
More...
UPDATE: 22 Knight detour from Mon Sep 23 through Thu Sep 26. Regular route to Pender and Main, then Main, Hastings, Clark, then resume regular route due to road block Started Until Fri Sep 27

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.