Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 22-Knight/Downtown at E 47 Ave on Northbound Knight St going 22 Downtown

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 15 - 22 Mins
at . 4:54 behind Vehicle 18338 Load 140%?

2: 28 - 31 Mins
at . 0:35 behind Vehicle 18325 Load 70%?

3: 44 - 1h01 Mins
at . 4:06 behind Vehicle 18350 Load 127%?

4: 59 - 1h06 Mins
at . 1:24 behind Vehicle 18314 Load 80%?

5: 1h14 - 1h18 Mins
at . 1:06 behind Vehicle 18402 Load 96%? Last seen 1:12

Stop 51275 Eastbound Terminal Ave @ Western St is temporarily closed through Sun Sep 29 due to construction. Started Wed Sep 11 Until Mon Sep 30
Affected routes:
22
Stop 58099 Burrard Station @ Bay 5 is temporarily closed from Sat Sep 21 at 8:00 AM to Sun Sep 22 at 10:00 PM due to construction. Started Sat Sep 21 Until
22 Downtown detour from Mon Sep 23 through Thu Sep 26. Regular route to Clark and Venables, via Clark, Hastings, Gore, Pender, resume regular route due to road block. Starts Until Fri Sep 27
More...
22 Knight detour from Mon Sep 23 through Thu Sep 26. Regular route to Pender and Gore, via Gore, Hastings, Clark, resume regular route due to road block. Starts Until Fri Sep 27
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.