Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 22-Knight/Downtown at E 6th Ave on Northbound Clark Dr going 22 Downtown

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 Mins
at . 0:32 ahead of Vehicle 18360 Load 100%?

2: 20 Mins
at . 0:13 ahead of Vehicle 18398 Load 93%?

3: 35 - 37 Mins
at . 0:14 behind Vehicle 18344 Load 147%?

4: 53 - 1h10 Mins
at . 8:09 behind Vehicle 18302 Load 227%?

5: 1h06 - 1h28 Mins
at . 1:35 behind Vehicle 18358 Load 80%?

Stop 51275 Eastbound Terminal Ave @ Western St is temporarily closed through Sun Sep 29 due to construction. Started Wed Sep 11 Until Mon Sep 30
Affected routes:
22
22 Downtown detour from Mon Sep 23 through Thu Sep 26. Regular route to Clark and Venables, via Clark, Hastings, Gore, Pender, resume regular route due to road block. Started Mon Sep 23 Until Fri Sep 27
More...
UPDATE: 22 Knight detour from Mon Sep 23 through Thu Sep 26. Regular route to Pender and Main, then Main, Hastings, Clark, then resume regular route due to road block Started Mon Sep 23 Until Fri Sep 27

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.