Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 145-Sfu/Production Station at Production Way on Westbound Lougheed Hwy going 145 Production Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 3:01 behind Vehicle 22001 Load 146%? Last seen 1:41

2: 8 Mins
at . 2:31 ahead of Vehicle 22010 Load 35%? Last seen 2:15

3: 12 Mins
at . 18:25 ahead of Vehicle 16218 Load 26%? Last seen 1:43

4: 20 Mins
at . Waiting 8:01. 0:00 behind Vehicle 8145 Load 50%? Last seen 1:49

5: 31 - 43 Mins
at . 5:17 ahead of Vehicle 8120 Load 160%? Last seen 1:07

Stop 58304 Northbound Production Way @ Broadway is temporarily closed from 8:00 AM to 4:00 PM on Sat May 4 due to construction. Starts May 4 Until May 4
Affected routes:
136
145
Stop 51863 SFU Transportation Centre @ Bay 1 has temporarily moved from west tunnel to east tunnel from 5:00 AM to 8:00 PM on Tue Apr 30 due to filming. Starts Apr 30 Until Apr 30

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.