Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 240-Lynn Valley/Downtown at Bay 5 on Lynn Valley going 240 Downtown

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 - 11 Mins
at . 0:48 ahead of Vehicle 9767 Load 123%? Last seen 4:08

2: 3 - 14 Mins
at . 4:01 ahead of Vehicle 9765 Load 89%?

3: 17 - 29 Mins
at . 0:38 behind Vehicle 9715 Load 195%?

4: 31 Mins
at . 0:00 behind Vehicle 9791 Load 129%? Last seen 1:46

5: 43 Mins
at . 0:00 behind Vehicle 9638 Load 185%?

Extended. 240 Downtown detour from Tue Jun 18 through Tue Jun 25. Regular route to 15th St and St Andrews then continue 15th Street resume regular route due to construction. Started Jun 18 Until Jun 26
240 Lynn Valley detour from 9:15 AM to 11:30 AM on Sat Jun 22. Regular route to temporary terminus at 15th St and Grand Blvd W due to special event. Starts Jun 22 Until Jun 22
240 Downtown detour from 9:15 AM to 11:30 AM on Sat Jun 22. From temporary terminus at Grand Blvd W and 15 St, via Grand Blvd W, 13 St, Grand Blvd E, 15 St, resume regular route due to special event. Starts Jun 22 Until Jun 22
Lynn Valley Days Parade

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.