Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Green Line at Anacostia, Green Line Center Platform going Branch Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 21:49 behind Vehicle 592 Load 90%? Empty

2: 9 - 19 Mins
at . 28:51 behind Vehicle 505 Load 140%? Empty

Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled maintenance. Use Green Line to Branch Avenue to continue trip.
Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled maintenance. Use Green Line to Branch Avenue to continue trip.
Trains operating every 8-16 mins w/ single tracking btwn Naylor Road & Branch Avenue due to scheduled maintenance. Info: wmata.com/weekend
Trains operating every 8-16 mins w/ single tracking btwn Naylor Road & Branch Avenue due to scheduled maintenance. Info: wmata.com/weekend

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.