Boston MBTA

 •  Framingham/Worcester Line

 
Map
 
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville until further notice. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville

Leaflet | Map data © OpenStreetMap contributors

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Worcester Line Train 510 (5:45 am from Worcester) is operating 5-15 minutes behind schedule between Grafton and South Station. Started Until
Affected direction: Inbound

Affected stops:
Grafton
Back Bay
Westborough
Southborough
Ashland
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley Farms
Auburndale
West Newton
Newtonville
Boston Landing
Lansdowne
South Station
Framingham Line Train 1511 (6:15 am from South Station) is operating 5-15 minutes behind schedule between South Station and Framingham. Started Until
Affected direction: Outbound

Affected stops:
South Station
Back Bay
Lansdowne
Boston Landing
Newtonville
West Newton
Auburndale
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Framingham
Framingham Line Train 1512 (6:35 am from Framingham) is operating 5-15 minutes behind schedule between Framingham and South Station. Started Until
Affected direction: Inbound

Affected stops:
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley Farms
Auburndale
West Newton
Newtonville
Boston Landing
Lansdowne
Back Bay
South Station
Worcester Line Train 515 (6:52 am from South Station) is operating 5-15 minutes behind schedule between South Station and Worcester. Started Until
Affected direction: Outbound

Affected stops:
Back Bay
Lansdowne
Boston Landing
Newtonville
West Newton
Auburndale
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Framingham
Ashland
Southborough
Westborough
Grafton
Worcester
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. Started Mon Jan 24 2022
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28 2025
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.
The Commuter Rail will operate on a weekend schedule on Thanksgiving Day, Thursday, November 27th and will resume operating on a regular weekday schedule the following day, Friday, November 28th. Starts Thu Nov 27 Until Sat Nov 29
Affected lines:
Fall River/New Bedford Line
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Kingston Line
Greenbush Line