Agencies » Boston MBTA

SL2-Design Center - South Station

to

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Route: SL2-Design Center - South Station
Shown Sat Dec 28 2024 to now
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Route: SL2-Design Center - South Station
Shown Sat Dec 28 2024 to now
South Station Elevator 927 (Alewife platform to Silver Line Drop-off platform) unavailable from Mon Dec 8 through Tue Dec 9 due to maintenance Starts Mon Dec 8 Until Wed Dec 10
To exit the Red Line, take nearby South Station Elevator 919 to the Airport/Design Center/Chelsea platform, then use South Station Elevator 918 to access the lobby. To board the Red Line, take South Station Elevator 918 to the Airport/Design Center/Chelsea platform, then use South Station Elevator 919 to access the Alewife platform.
Route: SL2-Design Center - South Station
Shown Fri Dec 5 to now
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville until further notice. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville
Shown Mon Oct 20 to now
Silver Line - SL2 is experiencing delays of up to 25 minutes due to disabled bus Started Sat Dec 6 Until Sat Dec 6
Route: SL2-Design Center - South Station
Shown Sat Dec 6 to
Silver Line - SL2 is experiencing delays of up to 30 minutes due to disabled bus Started Sat Dec 6 Until
Route: SL2-Design Center - South Station
Shown Sat Dec 6 to
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Route: SL2-Design Center - South Station
Shown Tue Apr 1 2025 to now