Current time: Refresh

 •  72M-Macdonald - San Pablo Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 1503 5:06 ahead of going Jack London Square Empty
aprchg West St on San Pablo Av

Vehicle 1510 1:22 behind going Point Richmond Empty
at 56th St on San Pablo Av

Vehicle 1523 14:00 behind going Point Richmond Empty
aprchg Canal Blvd on Garrard Blvd

Vehicle 1525 1:38 behind going Jack London Square Empty
aprchg Fairmount Av on San Pablo Av

Vehicle 1540 4:11 behind going Point Richmond Empty
past Carlson Blvd on San Pablo Av

Vehicle 1590 8:26 behind going Jack London Square Empty
aprchg W Cutting Blvd on S Garrard Blvd

Missing vehicles

Scheduled to be at 30th St on Macdonald Av going to Point Richmond.

Leaflet | Map data © OpenStreetMap contributors

San Pablo & 56th St. Stop Closed
San Pablo Ave. at 56th St. Stop Closed

Due to: Utility maintenance (East Bay MUD)

Effective: 7:00 a.m. – 3:00 p.m. September 17

Please see the AC Transit website for more information: https://www.actransit.org/node/30517
---

Cierre de la parada en San Pablo Ave. con 56th St.

Debido a: Mantenimiento de servicios públicos (East Bay MUD)

Efectivo: 7:00 a.m. – 3:00 p.m. 17 de septiembre

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/30517

---

San Pablo Ave. 和 56th St. 交叉口站暂停服务

由于:公用事业维护 (East Bay MUD)

生效时间:9 月 17 日,上午 7:00 至晚上 3:00

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/30517
San Pablo at 54th Stop Closed
San Pablo Ave. at 54th St. Stop Closed

Due to: Construction

Effective: 8:00 a.m. – 12:00 noon daily, September 14 – 16

Please see the AC Transit website for more information: https://www.actransit.org/node/23824
---
Cierre de la parada en San Pablo Ave. con 54th St.

Debido a: Construcción

Efectivo: 8:00 a.m. – 12:00 el mediodía, diario, 14 – 16 de septiembre

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/23824
---
San Pablo Ave. 和 54th St. 交叉口站

由于: 施工

生效日期: 9 月 14 日至 16 日,每天上午 8:00 至下午 12:00 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/23824