9A Greystone Outbound is on detour due to Construction in the area Started Jun 17 Until Jan 1 3000 Detour Notice:
Route: 9A Greystone Outbound
Location: Barrington St Before George St Bay 2 (6107)
Cause: Construction
Affected Stops:
Detouring Routing:
BEGIN ROUTING AT BAY #2,
CONTINUE SOUTHBOUND ON BARRINGTONMore...
9A Greystone Inbound is on detour due to Construction in the area Started Jun 17 Until Jan 1 3000 Detour Notice:
Route: 9A Greystone Inbound
Location: Barrington St Before Duke St (6106)
Cause: Construction
Affected Stops:
Detouring Routing:
FROM BARRINGTON ST
R-GEORGE ST
L-GRANVILLE ST
TERMINATE TRIP AT RELOCATED BARRINGTON ST AFTER DUKE ST BAY 1 (6087)More...
Vehicle 749 0:22 ahead of towards ↑9a Downtown Via Spring Garden Many Seats at Newton Ave on Chebucto Rd
Vehicle 1155 1:37 behind towards ↓9a Greystone- Fotherby Via Mumford Many SeatsOccupancy: 20% at Mumford Terminal Bay 2
Stop closure Bell Rd After Robie St (6291) is closed for construction Started Mar 11 Until Jan 1 3000 Stop Closure Notice:
Route: 9A Greystone Inbound
Location: Bell Rd After Robie St (6291)
Cause: Stop Closed Construction
Affected Stops:
Bell Rd After Robie St (6291)More...