Agencies » Boston MBTA

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL3-Chelsea Station - South Station, SL1-Logan Airport Terminals - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice pending replacement. Started Tue Mar 15 2022
The escalator will remain out of service for the foreseeable future. This decision was made after a thorough inspection determined that corrosion on the escalator’s steel truss was so severe that it could not be repaired further and that a complete replacement of the escalator would be required. Replacing the escalator at this location requires a more extended unit meeting modern escalator safety requirements. This longer unit will require significant alteration to the station entrance to meet code requirements. The MBTA has currently begun design work to understand what station upgrades will be needed.

Due to these complexities, we expect the escalator will remain out of service for a significant time. We recognize the challenges this poses to our riders, and please know we are working to identify a solution as quickly as possible. In the meantime, Government Center Station, which is fully accessible and serves the Blue Line, is under a quarter-mile from Bowdoin Station.
Route: Blue Line
Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice pending replacement. Started Wed Mar 22 2023
Route: Red Line
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable Started Thu Jun 13 2024
Route: Haverhill Line
State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable Started Mon Mar 31 2025
Route: Orange Line
Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance. Started Wed Apr 23 2025
Route: Haverhill Line
Ruggles Escalator 136 (Orange Line platform to upper lobby) unavailable Started Thu Jul 31 2025
Route: Orange Line
Chinatown Elevator 876 (Oak Grove platform to Washington St, Essex St) unavailable due to maintenance Started Mon Dec 29
To exit: get off the train at Tufts Medical Center. Go to the Washington St exit. At street level, cross Washington St. Take a Silver Line SL4 (South Station) or SL5 (Downtown) bus to Washington St and Essex St (Chinatown Station). Alternatively, if possible, travel 0.2 miles north on Washington St to Chinatown Station.


To board: go to the Silver Line SL5 bus stop at Washington St and Essex St. Take an SL5 (Downtown) bus to Tufts Medical Center (stay on bus past the Temple Pl stop).
Alternate route: travel 0.2 miles south on Washington St to Tufts Medical Center.
Route: Orange Line
Porter Escalator 510 (Ashmont/Braintree platform to paid lobby) unavailable due to maintenance Started Wed Jan 7
Route: Red Line
Orient Heights Escalator 441 (Wonderland platform to pedestrian bridge) unavailable due to maintenance Started Thu Jan 15
Route: Blue Line
Tufts Medical Center Escalator 147 (Forest Hills platform to Washington Street lobby) unavailable from Mon Feb 16 through Fri Feb 27 due to maintenance Starts Mon Feb 16 Until Sat Feb 28
Route: Orange Line
Central Escalator 360 (Alewife platform to street) unavailable from Mon Feb 2 through Fri Feb 20 due to maintenance Started Mon Feb 2 Until Sat Feb 21
Route: Red Line
South Station Escalator 382 (Alewife platform to lobby) unavailable due to maintenance Started Sat Jan 24
Routes: SL1-Logan Airport Terminals - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station, SL3-Chelsea Station - South Station, Red Line
Winchester Center Elevator 749 (Track 1 (outbound platform) to Main St) is out of service. Please use the ramp or elevator 748 from Track 1 to Waterfield St. parking. Started Mon Feb 2
Please use nearby Winchester Center Elevator 748.
Route: Lowell Line
South Acton Elevator 705 (Track 2 (Boston platform) to pedestrian bridge) out of service. Started Tue Feb 3
To travel from the North Station platform to the Fitchburg platform, travel east on Maple St towards Main St. At Main St., turn left and continue to Railroad St. At Rairoad St., turn lefr and continue to the station, where a ramp to the Fitchburg platform is located next the small parking lot. To travel from the Fitchburg platform to the North Station platform, travel to the east end of the platform and proceed down the ramp to the small parking lot. Continue east on Railroad St. to Main St. At Main St., turn right and continue to Maple St. At Maple St., turn right and continue to the walkway that leads to the platform.
Route: Fitchburg Line
Worcester Elevator 781 (Platform to pedestrian bridge) unavailable. Please use the elevator in the main building at 2 Washington Sq. Started Thu Feb 5
Route: Framingham/Worcester Line
East Taunton Elevator 779 (Platform to pedestrian bridge) unavailable. Please use the available ramp at the North end of the platform. Started Thu Feb 5
To exit: Go to the north end of the platform. Take the ramp to the parking lot.
To board: Take the path near the accessible drop-off/pick-up area. Take the ramp to the platform.
Route: Fall River/New Bedford Line
Prudential Escalator 152 (Heath Street platform to lobby) unavailable Started Until
Route: E-Green Line E
Copley Escalator 439 (Kenmore & West, Heath Street lobby to street) unavailable Started Until
Routes: B-Green Line B, E-Green Line E, C-Green Line C, D-Green Line D
Porter Escalator 507 (Alewife platform north to Ashmont/Braintree platform) unavailable due to maintenance Started
Route: Red Line
Aquarium Elevator 914 (Bowdoin platform to State Street lobby) unavailable Started Until
To exit, use Aquarium Elevator 923 located at the opposite end of the platform to access the Atlantic Ave lobby. To board, travel west along State St towards Long Wharf, then cross the Rose Kennedy Greenway. Continue to the Aquarium Atlantic Ave entrance and use Aquarium Elevator 925 located on the rear side of the station headhouse.
Route: Blue Line
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville until further notice. Started Mon Aug 4 2025
Affected direction: Outbound

Affected stops:
Readville
Routes 71 and 73 are detoured due to construction. The nearest connections are Mt Auburn St @ Mt Auburn Hospital or Mt Auburn St @ Traill St. Started Wed Aug 20
Affected stops:
Mt Auburn St @ Longfellow Rd (outbound)
Mt Auburn St @ Sparks St (outbound)
Mt Auburn St opp Sparks St (inbound)
Routes: 71-Watertown Square - Harvard Station, 73-Waverley Square - Harvard Station
Fare gates at South Station have resumed final testing. Riders will need to tap or scan to exit and enter the track area. Visit MBTA.com/CRGATES for more information. Started Tue Dec 30
Routes: Franklin/Foxboro Line, Greenbush Line, Kingston Line, Needham Line, Fall River/New Bedford Line, Providence/Stoughton Line, Framingham/Worcester Line
Fare gates at South Station have resumed final testing. Riders will need to tap or scan to exit & enter the track area. CharlieCard users: validate cards at South Station vending machine or with conductor. Started Tue Dec 30
-Extra staff will be onsite to assist.
-Visit MBTA.com/CRGATES for more information.
-Fairmount Line riders paying with a CharlieCard must validate their fare before entering or exiting the fare gates.
-If your trip begins at South Station, validate your CharlieCard at the fare vending machines near the station's ticket office. You'll then be able to tap your CharlieCard at the gate.
-If your trip ends at South Station, you'll need to see a conductor onboard or staff on the station platform to get an exit ticket. You'll scan this ticket at a reader to exit the gate.
-Fairmount Line Zone 1A stations will receive new Fare Vending Machines for CharlieCard validation for Commuter Rail use.
Route: Fairmount Line
Route 11 outbound is being detoured on weekdays from 7 AM to 4 PM through Friday, February 27, for construction. Connections are available at W 7th St @ D St and E 8th St @ Dorchester St. Starts Fri Feb 12 2027 Until Fri Feb 12 2027
Affected direction: Outbound

Affected stops:
W 7th St @ E St
W 7th St @ F St
W 7th St @ Dorchester St
Route: 11-City Point - Chauncy Street & Summer Street
Orange Line: Shuttle buses will replace service between Jackson Square and Forest Hills from February 14 - 16 for signal upgrades. Starts Sat Feb 14 Until Tue Feb 17
Accessibility:
All shuttle buses will be accessible.

Fare-Free Commuter Rail Alternative:
Riders can use the Franklin/Foxboro, Needham, or Providence/Stoughton Lines fare-free for service between Forest Hills, Ruggles, Back Bay and South Station. The trip between Forest Hills and Back Bay on the Commuter Rail is approximately 10 minutes. Regular fares will apply to travel beyond Forest Hills.

Travel Time:
Riders using shuttle bus service should budget extra travel time. For example, a rider traveling to Downtown Crossing from Forest Hills should allow for at least 20 minutes of travel in addition to their regular commute.

Shuttle Bus Stops:

Jackson Square:
Columbus Ave @ Amory St (1579 Columbus Ave)

Stony Brook:
Northbound - Stony Brook Station
Southbound - Amory St @ Boylston St (207 Amory St)

Green Street:
Northbound - Amory St @ Green St (420 Amory St)
Southbound - Green St Station (465 Amory St)

Forest Hills:
Forest Hills Station (Lower Busway)
Route: Orange Line
Orange Line: Shuttle buses will replace service between Back Bay and Forest Hills from February 28 - March 8, for signal upgrades. Starts Sat Feb 28 Until Mon Mar 9
Accessibility:
All shuttle buses will be accessible.

Fare-Free Commuter Rail Alternative:
Riders can use the Franklin/Foxboro, Needham, or Providence/Stoughton Lines fare-free for service between Forest Hills, Ruggles, Back Bay and South Station. The trip between Forest Hills and Back Bay on the Commuter Rail is approximately 10 minutes. Regular fares will apply to travel beyond Forest Hills.

Travel Time:
Riders using shuttle bus service should budget extra travel time. For example, a rider traveling to Downtown Crossing from Forest Hills should allow for at least 30 minutes of travel in addition to their regular commute.

Shuttle Bus Stops:

Back Bay:
Northbound/Southbound - Back Bay Station (165 Dartmouth St)

Massachusetts Avenue:
Northbound - Columbus Ave @ Mass Ave (584 Columbus Ave)
Southbound - Columbus Ave @ Mass Ave (585 Columbus Ave)

Ruggles:
Northbound - Ruggles Station (Upper Busway)
Southbound - Columbus Ave @ Melnea Cass Blvd.

Roxbury Crossing:
Route: Orange Line
Route 11 detoured due to snow until further notice. Connections outbound are W 7th St @ Dorchester St & Columbia Rd @ O St. Connections inbound are P St @ Columbia Rd & 180 Dorchester St opp W 7th St. Started Mon Feb 2
Affected stops:
E 8th St @ Dorchester St (outbound)
E 8th St @ Mercer St (outbound)
E 8th St @ Old Harbor St (outbound)
E 8th St @ Covington St (outbound)
E 8th St @ G St (outbound)
E 8th St @ H St (outbound)
E 8th St @ I St (outbound)
E 8th St @ K St (outbound)
E 8th St @ L St (outbound)
E 8th St @ M St (outbound)
E 8th St @ N St (outbound)
E 8th @ Columbia Rd (inbound)
E 8th St @ M St (inbound)
E 8th St @ L St (inbound)
E 8th St @ K St (inbound)
E 8th St @ I St (inbound)
E 8th St @ H St (inbound)
E 8th St @ G St (inbound)
E 8th St @ Covington St (inbound)
E 8th St @ Old Harbor St (inbound)
E 8th St @ Mercer St (inbound)
E 8th St @ Dorchester St (inbound)
Route: 11-City Point - Chauncy Street & Summer Street
Red Line: Shuttle buses will replace service between Broadway and Ashmont the weekend of February 21 - 22, for signal work. Train service will operate between JFK/UMass and Braintree & Broadway and Alewife. Starts Sat Feb 21 Until Mon Feb 23
Additional Travel Time:
Riders using shuttle buses should budget extra time. For example, a rider traveling to Downtown Crossing from Ashmont should budget at least an additional 40 minutes of travel in additional to their regular commute.

Commuter Rail Alternatives:
Riders are strongly encouraged to use the Fall River/New Bedford, Kingston, and Greenbush (Old Colony) Commuter Rail lines for fare-free service between Braintree, Quincy Center, JFK/UMass, and South Station. Regular fares will be collected for trips beyond Braintree.

Accessibility:
Accessible van service will be available between the Savin Hill headhouse and the shuttle stop, and between Broadway and Ashmont. Vans can be requested by MBTA personnel or by a station call box.

Shuttle Locations:

Broadway:
W. Broadway @ Broadway Station

Andrew:
Northbound - Dorchester Ave @ Leeds St
Southbound - Dorchester Ave @ Dexter St

JFK/UMass:
All shuttles - Outer Busway

Savin Hill:
Northbound- Dorchester Ave @
Route: Red Line
Route 429 detoured outbound due to construction. Connections are available at Lynn Station and Market St @ Liberty St. Started Fri Feb 6
Affected direction: Outbound

Affected stops:
Oxford St @ Washington St
Oxford St @ Market St
Route: 429-Northgate Shopping Center - Central Square, Lynn
Route 435 detoured outbound due to construction. Connections are available at Neptune Blvd @ Blossom St and Lynn Station. Started Fri Feb 6
Affected direction: Outbound

Affected stops:
Tremont St opp St Mary's High School
Market St @ Tremont St
Route: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square
Hingham/Hull Ferry: All service on the Hingham/Hull route is being replaced with an alternate schedule between Hull, Logan, and Long Wharf through Friday, February 13. View PDF Timetable on the MBTA website. Started Mon Feb 9 Until
A shuttle service is operating between Nantasket Beach and the Hull Ferry Terminal through Friday, February 13. See PDF on the website for more details.

Affected stops:
Hingham
Route: Boat-F1
A shuttle service will operate through Friday, February 13, between Nantasket Beach & Hull Ferry Terminal. The first shuttle bus will depart from Nantasket Beach at 6:30 AM. See page 2 of the PDF for more info. View PDF Timetable on the MBTA website. Started Tue Feb 10 Until
The last shuttle bus will depart from Pemberton Point at 10:35 PM.

Passengers may park in the DCR parking lots between Nantasket Avenue and Nantasket Beach. The entrance to the parking lots is near 120 Nantasket Avenue.

Shuttle bus stop 1 is near 176 Nantasket Ave.
Shuttle bus stop 2 is near 208 Nantasket Ave.

Affected stops:
Hingham
Route: Boat-F1
Rtes 441 & 442 detoured - omitting Old Town due to construction. Connect at Pleasant St @ Washington St. Started Until
Routes: 441-Marblehead - Wonderland Station via Paradise Road, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street
Route 11 is experiencing delays of up to 30 minutes due to disabled bus Started Until
Route: 11-City Point - Chauncy Street & Summer Street
Route 109 detoured inbound due to construction. Connections are Somerville Ave @ Stone Ave & Harvard Sq @ Garden St - Dawes Island. Started Until
Affected direction: Inbound

Affected stops:
Washington St @ Webster Ave
Washington St opp Parker St
Washington St @ Dane St
Washington St @ Beacon St
Kirkland St opp Trowbridge St
Kirkland St @ Kirkland Place
Route: 109-Linden Square - Harvard Square via Sullivan
Route 29 is experiencing delays of up to 30 minutes due to traffic Started Until
Route: 29-Mattapan Station - Jackson Square Station
CT2 detoured. Connection points at Hampshire St @ Cardinal Medeiros Ave and Prospect St @ Union Sq - Green Line. Started Until
Affected direction: Outbound

Affected stops:
Columbia St @ Cambridge St
Route: CT2-Sullivan Square Station - Ruggles Station
Route 85 detoured. Connection points at Hampshire St @ Union St and Bow St @ Warren Ave Started Until
Affected direction: Outbound

Affected stops:
Columbia St @ Cambridge St
Webster Ave @ Prospect St
Route: 85-Spring Hill - Kendall/MIT Station
Providence Line Train 839 (12:20 pm from South Station) is operating 35-45 minutes behind schedule between Route 128 and Wickford Junction due to a switch issue in the Canton area. Started Until
Affected direction: Outbound
Route: Providence/Stoughton Line
Route 50 is experiencing delays of up to 25 minutes due to traffic Started Until
Routes: 40/50-Georgetowne - Forest Hills Station, 50-Cleary Square - Forest Hills Station
Route 26 is experiencing delays of up to 25 minutes due to traffic Started Until
Route: 26-Ashmont Station - Norfolk Street Loop
Route 455 is experiencing delays of up to 25 minutes due to traffic Started Until
Route: 455-Salem Depot - Wonderland Station
Route 71 is experiencing delays of up to 30 minutes due to traffic Started Until
Route: 71-Watertown Square - Harvard Station
Please board all outbound Framingham/Worcester Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00 pm. Started Until
Affected direction: Outbound

Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Framingham
Route: Framingham/Worcester Line
Please board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm. Started Until
Affected direction: Inbound

Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Route: Framingham/Worcester Line
Please board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00 pm. Started Until
Affected direction: Inbound

Affected stops:
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley Farms
Route: Framingham/Worcester Line
Lynn Parking Garage is partially closed, but has sufficient parking capacity to accommodate daily demand. Started Thu Nov 4 2021
Routes: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street, 455-Salem Depot - Wonderland Station, 456-Salem Depot - Central Square, Lynn, 436-Liberty Tree Mall - Central Square, Lynn via Goodwin Circle, 439-Nahant - Wonderland Station, 441-Marblehead - Wonderland Station via Paradise Road, 426-Central Square, Lynn - Haymarket or Wonderland Station, 429-Northgate Shopping Center - Central Square, Lynn
Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work. More information is available at https://www.town.hull.ma.us/ Started Thu Jun 27 2024
Route: Boat-F1
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, Fairmount Line, Foxboro Event Service, SL2-Design Center - South Station, Franklin/Foxboro Line, Red Line, Kingston Line, Fall River/New Bedford Line, Framingham/Worcester Line, Greenbush Line, Needham Line, Providence/Stoughton Line
Construction is ongoing in the Hingham Parking lot and on Shipyard Drive in preparation for the Hingham Ferry Dock upgrades. There is reduced parking in the lot, and portions of Shipyard Drive and driveways to and from the parking lot are affected Started Tue Aug 19
Route: Boat-F1
The following stop is closed on weekdays from 7 AM to 4 PM through Saturday, Feb 28, due to roadway construction: Green St @ Magazine St (inbound). Please use Western Ave @ Green St. Starts Fri Feb 27 Until Fri Feb 27
Affected routes:
70
Route: 70-Market Place Drive or Waltham Center - University Park
Rte 119 on snow route omitting the Beachmont Loop and Tomasello Way. Connect at Beachmont Station. Started Mon Feb 2
Bypassed stops:
Crescent Ave @ Orchard St (inbound)
Crescent Ave @ Webster St (inbound)
Crescent Ave @ Summer St (inbound)
Crescent Ave @ Winthrop Pkwy (inbound)
Endicott Ave opp Bradstreet Ave (inbound)
200 Endicott Ave (inbound)
Endicott Ave @ Waterview Ave (inbound)
Endicott Ave @ Leverett Ave (inbound)
Endicott Ave @ Atlantic Ave (inbound)
Route: 119-Northgate Shopping Center - Beachmont Station
Route 92 inbound snow route in effect until further notice. Connections are Main St @ W School St & N Washington St @ Medford St. Started Mon Feb 2
Affected direction: Inbound

Affected stops:
Main St @ Union St
Main St @ Harvard St
Main St @ City Sq
Route: 92-Sullivan Square Station - Downtown via Main Street
Route 121 snow route in effect until further notice. Connections outbound are Maverick & Bennington St @ Neptune Rd. Connections inbound are Bennington St @ Chelsea St & Maverick. Started Mon Feb 2
Affected stops:
Meridian St @ Havre St (outbound)
Meridian St @ Saratoga St (outbound)
Lexington St @ Marion St (outbound)
Lexington St @ Brooks St (outbound)
Lexington St @ Putnam St (outbound)
Lexington St @ Prescott St (outbound)
Lexington St @ Shelby St (outbound)
E Eagle St @ Chelsea St (outbound)
Eagle St @ Lexington St (inbound)
Lexington St @ Prescott St (inbound)
Lexington St @ Putnam St (inbound)
Lexington St @ Brooks St (inbound)
Lexington St @ Marion St (inbound)
Lexington St @ Meridian St (inbound)
Meridian St @ Liverpool St (inbound)
Meridian St @ Havre St (inbound)
Route: 121-Wood Island Station - Maverick Station
Route 8 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 8-Harbor Point - Kenmore Station
Route 28 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 28-Mattapan Station - Ruggles Station
Providence Line Train 852 (2:25 pm from Wickford Junction) is expected to depart Wickford Junction 10-20 minutes behind schedule due to a switch issue in the Canton area. Started Until
Affected direction: Inbound
Route: Providence/Stoughton Line
Route 62 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 62-Bedford VA Hospital - Alewife Station
Route 77 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 77-Arlington Heights - Harvard Station
Route 21 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 21-Ashmont Station - Forest Hills Station
Route 47 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 47-Central Square, Cambridge - Broadway Station
Providence Line Train 843 (1:17 pm from South Station) is operating 5-15 minutes behind schedule between Ruggles and Providence. Started Until
Affected direction: Outbound
Route: Providence/Stoughton Line
Route 210 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 210-Quincy Center Station - Fields Corner Station
Route 240 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 240-Avon Square - Ashmont Station
Route 73 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 73-Waverley Square - Harvard Station
Route 350 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 350-North Burlington - Alewife Station
Route 137 is experiencing delays of up to 20 minutes due to disabled bus Started Until
Route: 137-Reading Depot - Malden Center Station
Route 441 is experiencing delays of up to 20 minutes due to traffic Started Until
Routes: 441-Marblehead - Wonderland Station via Paradise Road, 441/442-Marblehead - Wonderland Station
Franklin Line Train 743 (1:28 pm from South Station) is operating 5-15 minutes behind schedule between Ruggles and Forge Park/495. Started Until
Affected direction: Outbound
Route: Franklin/Foxboro Line
Route 24 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 24-Wakefield Avenue & Truman Parkway - Ashmont Station
Route 100 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 100-Elm Street - Wellington Station
Route 108 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 108-Linden Square - Wellington Station
Route 109 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 109-Linden Square - Harvard Square via Sullivan
Route 110 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 110-Wonderland Station - Wellington Station
Route 34 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 34-Dedham Square - Forest Hills Station
Route 1 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 1-Harvard Square - Nubian Station
Route 15 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 15-Fields Corner Station - Ruggles Station
Route 10 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 10-City Point - Arlington Station
Route 16 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 16-Forest Hills Station - Andrew Station or Harbor Point
Route 17 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 17-Fields Corner Station - Andrew Station
Route 44 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 44-Jackson Square Station - Ruggles Station
Fitchburg Line Train 424 (1:25 pm from Wachusett) is operating 5-15 minutes behind schedule between West Concord and North Station due to a temporary speed restriction in effect at a crossing in the West Concord area. Started Until
Affected direction: Inbound
Route: Fitchburg Line
Route 114 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 114-Market Basket - Maverick Station
Route 116 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 116-Wonderland Station - Maverick Station
Route 435 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square
Route 436 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 436-Liberty Tree Mall - Central Square, Lynn via Goodwin Circle
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance. Started Fri Jun 30 2023
Affected lines:
Fall River/New Bedford Line
Route: Fall River/New Bedford Line
Littleton/Route 495 passengers can expect occasional traffic and detours accessing the station due to the Foster Street reconstruction work. Started Wed Feb 5 2025
Scheduled to complete sometime in 2027, the Reconstruction of Foster Street includes widening and resurfacing with the addition of bicycle lanes.
Route: Fitchburg Line
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28 2025
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.
Route: Framingham/Worcester Line
Jackson Square: The stairway connecting the Jackson Sq lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator. Started Mon Jun 30 2025
Route: Orange Line
To accommodate Providence Station Renovations, construction barriers have been installed and the Southern stairwell to Track 1 is out of service. Staircase access to Track 3 and Track 5 are now open. Started Thu Jul 17 2025
Affected lines:
Providence/Stoughton Line
Foxboro (Special Events)
Routes: Foxboro Event Service, Providence/Stoughton Line
Jackson Square: The platform is undergoing renovations to improve safety and accessibility. Sections of the platform are unlevel, which may make it difficult for some riders to board and exit trains. Started Sat Sep 27
Please see station personnel or use a station call box to request assistance.
Route: Orange Line
Market St @ Tremont St (inbound & outbound) is closed until further notice due to construction. Riders of the 426, 429, 441, 442, 455 can board at S Common St @ Market St. Riders of the 435 can board at Tremont St opp St Mary's High School. Started Sun Dec 14
Affected routes:
426
429
435
441
442
455
Routes: 426-Central Square, Lynn - Haymarket or Wonderland Station, 429-Northgate Shopping Center - Central Square, Lynn, 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square, 441-Marblehead - Wonderland Station via Paradise Road, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street, 455-Salem Depot - Wonderland Station
Broadway @ Temple St (outbound) has moved due to construction. The stop is relocated to Grant St, in front of 281 Broadway. Started Fri Jan 16 Until Mon Apr 6
Affected routes:
89
101
Routes: 101-Malden Center Station - Sullivan Square Station via Winter Hill, 89-Clarendon Hill or Davis Station - Sullivan Square Station, 89/93-Clarendon Hill - Haymarket Station
The following stop is closed on weekdays from 7 AM to 4 PM through Friday, Feb 27, due to construction: Franklin St @ Sidney St. Riders can use the temporary stop at Sidney St @ Green St. Starts Fri Feb 27 Until Fri Feb 27
Affected routes:
70
Route: 70-Market Place Drive or Waltham Center - University Park
Massachusetts Ave @ Wendell St (outbound) Bus Stop has moved about 100 feet south, from 7:00 AM - 4:00 PM on weekdays only, until further notice due to construction. Starts Fri Feb 12 2027 Until Fri Feb 12 2027
Affected routes:
77
96
Routes: 77-Arlington Heights - Harvard Station, 96-Medford Square - Harvard Station
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station from 8:30 PM through the end of service on Wednesday, February 18, and Thursday, February 19, for maintenance work. Starts Thu Feb 19 Until Fri Feb 20
Silver Line buses will be operating on surface roads due to maintenance work in the Transitway.

Please note: Real-time tracking for Silver Line buses may be inaccurate at times during this diversion. Customers should use the MBTA Go app, subscribe to T Alerts, or check our website for the latest service information.

MBTA Go App: MBTA.com/GoApp
T Alerts Sign Up: alerts.mbta.com
Schedules: https://www.mbta.com/schedules/bus

Street Level Stop Locations:
Connections for South Station can be made on Summer St @ Atlantic Ave
Connections for World Trade Center Station can be made on Congress St @ World Trade Center Station
Connections for Courthouse Station can be made on Seaport Blvd @ Farnsworth St

All shuttle bus stops are accessible for persons with disabilities.

Affected stops:
South Station Silver Line - Outbound (outbound)
Courthouse - Outbound (outbound)
World Trade Center - Outbound (outbound)
Silver Line Way after Manulife Building (outbound)
Silver Line
Routes: SL1-Logan Airport Terminals - South Station, SL2-Design Center - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station