Agencies » Boston MBTA

Stop: Terminal B Stop 2 - Arrivals Level on SL1-Logan Airport Terminals - South Station (stop list)

Add additional routes that share this stop

Date:

View Headway Chart

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Route: SL1-Logan Airport Terminals - South Station
Shown Mar 3 to now
TimeTrip PathVehicleGapHeadwayScheduleDestination
- trip path13399:00 1:04 behind South Station
trip path13033:119:00 3:00 ahead of South Station
trip path132417:399:00 5:41 behind South Station
- trip path13340:289:00 2:43 ahead of South Station
- trip path131112:249:00 1:17 behind South Station
- trip path13402:309:00 3:54 ahead of South Station
- trip path13397:268:20 3:43 ahead of South Station
trip path13035:408:20 6:03 ahead of South Station

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.