• 85-Millwood
Jump to: ↓South
| |||||||||||||||||||||||||||||||||||||||||
Stop Closure Notice
Routes: 85 Millwood Inbound
Date Effective: Monday, August 17, 2026 03:00
Location: Sackville Dr After Beaver Bank Rd (9037)
Cause: Stop Closed Construction
Affected Stops:
Sackville Dr After Beaver Bank Rd (9037)
Stop Closure Notice
Routes: 85 Millwood Inbound
Date Effective: Saturday, August 15, 2026 03:00
Location: Sackville Dr At Civic 791 (7318)
Cause: Stop Closed Construction
Affected Stops:
Sackville Dr At Civic 791 (7318)
Route 185, 85, 9A Inbound, Outbound departing at Monday, August 17, 2026 05:15 from Burnside Transit Center arriving at Monday, August 17, 2026 08:25 Burnside Transit Center is cancelled