Please note the following stop / stops are closed: Oxbury Mall EB Started Feb 20 Until Jan 1 3000 Due to construction, stop #1307 Oxbury Centre EB is closed. Please catch the bus at the closest open stop, #1309 Oxford at Highbury EB.
Please note the following stop / stops are closed: John Paul Secondary School WB Started Feb 20 Until Jan 1 3000 Due to construction, stop #1310 John Paul Secondary School WB is temporarily relocated. Please catch the bus at the temp stop located 1 utility pole east of the stop (approx. 40m).
Please note the following stop / stops are closed: Oxford at Mornington EB Started Feb 20 Until Jan 1 3000 Due to construction, stop #1322 Oxford at Mornington EB is temporarily relocated. Please catch the bus at the temp stop located 2 poles west of stop (approx. 50m).
Route 4 Ridout Bridge Construction Detour Northbound Started Feb 21 Until Apr 28 Route 4 Northbound is on detour between Ridout and Grand NB and Richmond north of Horton NB.
The following detour will be in place during this time: North on Ridout, R-Grand, L-Carfrae, Continue onto Richmond, to regular route.
The following stops will be closed: Ridout at Craig NB, Ridout at Ingleside NB, Horton at Ridout EB. More...
Route 4 Ridout Bridge Construction Detour Southbound Started Feb 21 Until Apr 28 Route 4 Southbound is on detour between Richmond at King SB and Ridout at Tecumseh SB.
The following detour will be in place during this time: South on Richmond, Continue onto Carfrae, R-Grand, L-Ridout, to regular route.
The following stops will be closed: Horton at Richmond WB, Ridout at Horton SB, Ridout at Craig SB, Ridout at Elmwood SB. More...