Current time: Refresh

Agencies » London Transit

Please note the following stop / stops are closed: Oxbury Centre Started Apr 22 Until Jan 1 3000
Due to construction, stop #1307 Oxbury Centre EB is closed. Please catch the bus at the closest open stop, #1309 Oxford at Highbury EB.
Please note the following stop / stops are closed: John Paul Secondary School Started Apr 22 Until Jan 1 3000
Due to construction, stop #1310 John Paul Secondary School WB is temporarily relocated. Please catch the bus at the temp stop located 1 utility pole east of the stop (approx. 40m).
Please note the following stop / stops are closed: Oxford at Mornington EB Started Apr 22 Until Jan 1 3000
Due to construction, stop #1322 Oxford at Mornington EB is temporarily relocated. Please catch the bus at the temp stop located 2 poles west of stop (approx. 50m).

Remove ads by becoming a Premium User

 • : Route 4 at Quebec on Oxford

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 - 9 Mins
at . 0:23 ahead of Vehicle 3152 Load 107%? Many Seats Available Occupancy: 40% 4a Fanshawe College via Downtown

2: 11 - 17 Mins
at . 1:41 ahead of Vehicle 3539 Load 47%? Many Seats Available 4b Fanshawe College via Downtown

3: 33 - 43 Mins
at . Waiting 11:11. 1:09 behind Vehicle 3377 Load 94%? 4a Fanshawe College via Downtown

4: 57 - 1h13 Mins
at . 6:54 behind Vehicle 3574 Load 203%? 4b Fanshawe College via Downtown

5: 1h17 - 1h21 Mins
at . 1:53 behind Vehicle 3319 Load 114%? 4a Fanshawe College via Downtown

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.