Commuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford. Started Tue Jul 23 Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.
More...
Please board all Haverhill Line trains on the inbound platform (Track 2) at Wakefield and Greenwood until further notice. Started Thu Aug 1 Affected stops:
Greenwood
Wakefield