•  Framingham/Worcester Line

 
Stops
 
On Fri, Nov 6 and Mon, Nov 9, a temporary construction schedule will be in effect on the Framingham/Worcester Line with reduced service and most trains making all stops to accommodate signal improvement work. Starts Mon Nov 9 Until Tue Nov 10
From Sat, Nov 7 through Sun, Nov 8, Framingham/Worcester Line service between Framingham and Boston will be replaced by shuttle bus to accommodate track improvement work. Starts Sat Nov 7 Until Mon Nov 9
Shuttle Routes:
There will be four shuttle routes with timed connections at Wellesley Hills
1. Framingham - South Station Express
• All stops Framingham - Wellesley Hills; express Wellesley Hills - South Station
2. Wellesley Hills - South Station Local
• Most stops Wellesley Hills - South Station, plus Riverside for Green Line
3. Framingham - Back Bay Express
• All stops Framingham - Wellesley Hills; express Wellesley Hills - Back Bay
4. Wellesley Hills - Back Bay Local
• Most stops Wellesley Hills - Back Bay, plus Riverside for Green Line

Wellesley Farms and Lansdowne will have no Commuter Rail or Shuttle Bus service. For Wellesley Farms passengers, consider travel to Wellesley Hills or Riverside. For Lansdowne passengers, consider travel to Kenmore for Green Line service.

Affected stations:
South Station
Back Bay
Lansdowne
Boston Landing
Newtonville
West Newton
Auburndale
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Framingham

Travel Time:
Riders using the shuttle buses should budget extra travel time. Riders traveling from Framingham to Boston on an Express route should budget an extra 20 minutes in addition to their regular trip time. Riders traveling from Wellesley Hills to Boston on a Local route should budget an extra 40 minutes in addition to their regular trip time.

Accessibility Information:
All shuttle buses are equipped with a wheelchair lift or ramp, and all shuttle stops are accessible.

View Shuttle Route and Stops:
https://platform.remix.com/project/b9987ef0?latlng=42.3548,-71.18683,17.047&sp.id=6c3828a8-f967-4152-bf32-988bae2bdc47

Shuttle Stop Locations:
• South Station – Inbound/Outbound: South Station Bus Terminal Gates 4, 5, and 6
• Back Bay – Inbound: Clarendon St @ Stanhope St, Outbound: Dartmouth St @ Back Bay Station
• Lansdowne – Not Served
• Boston Landing – Inbound: Guest St @ New Balance Way, Outbound: Guest St opp New Balance Way
• Newtonville – Inbound/Outbound: Washington St @ Walnut St
• West Newton – Inbound: Washington St @ Highland St, Outbound: Washington St @ Cherry St
• Auburndale – Inbound: Auburn St opp Melrose St, Outbound: 375 Auburn St
• Wellesley Farms – Not Served
• Wellesley Hills – Inbound: Washington St @ Abbott Rd, Outbound: Washington St opp Abbott Rd
• Wellesley Square – Inbound: Central St opp Railroad Ave, Outbound: Central St @ Railroad Ave
• Natick Center – Inbound: South Ave @ Washington St, Outbound: South Ave opp Adams St
• West Natick – Inbound: W Central opp West Natick Parking Lot, Outbound: W Central St @ West Natick Parking Lot
• Framingham - Inbound/Outbound: Waverly St @ Framingham Station
On Sun, Oct 25, at the end of service, the Framingham/Worcester Line construction schedule will end. Full service resumes on Mon, Oct 26, with a new Fall/Winter schedule available on mbta.com/cr. Starts Until Mon Nov 2

Jump to: →East

←Worcester
South Station
Back Bay
Lansdowne
Boston Landing
Newtonville
West Newton
Auburndale
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
Framingham
Ashland
Southborough
Westborough
Grafton
Worcester
→South Station
Worcester
Grafton
Westborough
Southborough
Ashland
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley Farms
Auburndale
West Newton
Newtonville
Boston Landing
Lansdowne
Back Bay
South Station
Não existe um caminho acessível que ligue as plataformas do sentido centro e do sentido bairro na estação Wellesley Square. O percurso existente inclui declives acentuados e é longo. Estão em andamento projetos para garantir um percurso totalmente em conformidade com as normas. Started Fri Feb 28 2025
Existem plataformas elevadas de acesso facilitado na extremidade oeste dos lados da Pista 1 e da Pista 2. No entanto, o caminho pedonal existente entre os dois lados é longo e inclui declives acentuados, especialmente na ponte da Crest Road sobre os trilhos. Estão em andamento projetos para garantir um percurso totalmente em conformidade com as normas.
Lembrete: o portão de trânsito na High St. para o Southern Ashland Parking Lot não é para acesso público. Por gentileza, acesse o estacionamento pela Memorial Dr., saindo da W. Union St. Started Mon Aug 24
From late August through late November, 2026, South Station restrooms will be under construction. Temporary restroom facilities have been positioned along Atlantic Ave. Started Thu Sep 3
Linhas afetadas:
Fairmount Line
Fall River/New Bedford Line
Framingham/Worcester Line
Franklin/Foxboro Line
Greenbush Line
Kingston Line
Needham Line
Providence/Stoughton Line