Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 69-Harvard Square - Lechmere Station at Columbia St on Cambridge St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:12 Mins
at . 6:59 behind Vehicle 1950 Load 147%? Many Seats Lechmere

2: 34 Mins
at . 0:31 behind Vehicle 1950 Load 105%? Lechmere

3: 51 Mins
at . 1:18 behind Load 52%? Lechmere

4: 1h06 Mins
at . 1:23 behind Load 47%? Lechmere

5: 1h21 Mins
at . (Sched. based) 0:00 behind Vehicle 1950 Lechmere

The following stop will be temporarily closed from 8:00 PM to 5:00 AM beginning Wednesday, June 5th, until Thursday, June 6th due to construction: Cambridge St @ Third St. Passengers can board at Cambridge St @ Sciarappa St. Starts Jun 6 Until Jun 7
Affected routes:
69
The following stop is closed from 7:00 AM to 5:00 PM on Friday, June 7th, due to construction: Cambridge St @ Third St. Passengers can board at Cambridge St @ Sciarappa St. Starts Jun 7 Until Jun 7
Affected routes:
69
The following stop is closed from 9:00 AM to 5:00 PM on Saturday, June 8th due to construction: Cambridge St @ Third St. Passengers can board at Cambridge St @ Sciarappa St. Starts Jun 8 Until Jun 8
Affected routes:
69

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.