Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 39-Forest Hills Station - Back Bay Station at Spalding St on South St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:00 Mins
at . 7:23 behind Vehicle 1223 Load 23%? Back Bay

2: 16 Mins
at . 7:47 behind Vehicle 1222 Load 103%? Back Bay

3: 34 Mins
at . 10:56 behind Vehicle 1200 Load 121%? Back Bay Last seen 1:17

4: 44 Mins
at . 5:34 behind Vehicle 1251 Load 64%? Back Bay

5: 58 Mins
at . (Sched. based) 5:05 behind Vehicle 1205 Back Bay

The door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible, Started Aug 30 2022
Route 39 is experiencing delays of up to 20 minutes due to traffic Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.