• : E-Green Line E at Medford/Tufts going Heath Street
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 Mins
at . (Sched. based) 0:00 behind Vehicle G-10227 Load 198%? ↩
2: 19 Mins
at . (Sched. based) 0:00 behind Vehicle G-10099 ↩ Last seen 1:25
3: 30 Mins
at . (Sched. based) 0:00 behind Vehicle G-10161 ↩
4: 1h13 Mins
at . (Sched. based) 0:00 behind Vehicle G-10269 ↩
The two Arlington Station entrances adjacent to 350 Boylston St are temporarily closed due to construction. Riders can use the entrances across the street in front of 320 Boylston St. Started Wed Jun 12
Affected lines:
Green Line B branch
Green Line C branch
Green Line D branch
Green Line E branchMore... Add stop (different agency)