Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Wedgewood on Huron

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 15 - 19 Mins
at . 2:25 behind Vehicle 3590 Load 110%? King Edward via Wellington & Dundas

2: 47 - 50 Mins
at . Waiting 8:12. 2:09 ahead of Vehicle 3314 Load 111%? King Edward via Wellington & Dundas

3: 1h10 Mins
at . 0:00 behind Vehicle 3523 Load 81%? 1a Pond Mills via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.