Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Belfield on Kipps

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 11 Mins
at . 0:09 ahead of Vehicle 3374 Load 80%? King Edward via Wellington & Dundas

2: 31 Mins
at . 0:01 ahead of Vehicle 3314 Load 101%? 1a Pond Mills via Wellington & Dundas

3: 51 - 55 Mins
at . Waiting 6:54. 0:17 behind Vehicle 3523 Load 102%? King Edward via Wellington & Dundas

4: 1h06 - 1h17 Mins
at . 7:16 behind Vehicle 3343 Load 110%? 1a Pond Mills via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.