Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Waterloo on York

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 11 Mins
at . 1:30 behind Vehicle 3314 Load 82%? Many Seats Available Occupancy: 20% 1b Kipps Lane via Wellington & Dundas

2: 1h05 - 1h10 Mins
at . 20:23 behind Vehicle 3523 Load 146%? 1a Kipps Lane via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.