Current time: Refresh

Agencies » Boston MBTA

Route 132 detoured due to construction. Connections inbound are Washington St @ Grove St & Summer St @ Clifton St. Connections outbound are Summer St @ Clifton St & Washington St @ Oak Grove Station. Started Until
More...

Remove ads by becoming a Premium User

 • : 132-Redstone Shopping Center - Malden Center Station at

Prev Stop | Next Stop | Schedule | Set Destination

1: 2 Mins
at . (Sched. based) 9:47 behind Vehicle 2074 Load 81%? Many Seats Available Occupancy: 0% Malden

2: 9 Mins
at . 0:00 behind Vehicle 2020 Redstone

3: 31 Mins
at . (Sched. based) 0:00 behind Vehicle 0860 Malden

4: 57 Mins
at . (Sched. based) 0:00 behind Vehicle 2020 Malden

5: 1h06 Mins
at . (Sched. based) 0:00 behind Vehicle 2020 Redstone

Route 132 experiencing delays of up to 20 minutes due to traffic Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.