Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 73-Waverley Square - Harvard Station at

Prev Stop | Next Stop | Schedule | Set Destination

1: 3 Mins
at . (Sched. based) 18:50 behind Vehicle 2025 Load 183%? Harvard

2: 5 Mins
at . 0:00 behind Vehicle 3139 Waverley Last seen 2:47

3: 6 Mins
at . (Sched. based) 5:45 behind Vehicle 2093 Load 17%? Harvard

4: 21 Mins
at . 0:00 behind Vehicle 2079 Load 100%? Waverley

5: 23 Mins
at . (Sched. based) 5:58 behind Vehicle 2009 Harvard

Route 73 experiencing delays of up to 20 minutes due to traffic Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.