Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at World Trade Center Sta on Congress St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 4 - 7 Mins
at . 4:47 ahead of Vehicle 1309 Load 67%? Many Seats Available South Station
past Airport Only

2: 16 - 26 Mins
at . Waiting 10:01. 7:54 ahead of Vehicle 1315 Load 54%? Many Seats Available South Station
aprchg Chelsea Only

3: 35 - 41 Mins
at . 8:47 ahead of Vehicle 1312 Load 117%? South Station
aprchg Eastern Avenue Only

4: 46 - 56 Mins
at . 10:24 ahead of Vehicle 1314 Load 73%? South Station
past Silver Line Way Only

5: 1h04 - 1h22 Mins
at . 5:18 ahead of Vehicle 1318 Load 136%? South Station
past World Trade Center Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL3 experiencing delays of up to 20 minutes due to drawbridge being raised Started Until
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.