Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : E-Green Line E at Brigham Circle

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: At Stop 1:44 behind Vehicle 3888-3674 Load 55%? Medford/Tufts Last seen 1:00

2: At Stop (Sched. based) 5:03 behind Vehicle G-10244 Load 43%? Medford/Tufts Last seen 1:00

3: 2 Mins
at . (Sched. based) 0:39 behind Vehicle G-10330 Load 100%? Medford/Tufts Last seen 2:24

4: 5 Mins
at . 3:12 behind Vehicle 3874-3606-3602 Load 237%? Medford/Tufts Last seen 2:24

5: 13 Mins
at . Added Vehicle 3677-3857 Load 212%?

Green Line: Trains will bypass Magoun Square on the E Branch, from start to end of service on May 4, for improvement work on an accessibility ramp at the Station. Riders can use Bus Routes 80 and 88, which operate between the Magoun Sq area and Lechmere. Starts May 4 Until May 5
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.