• : Metra Electric at 51st/53rd St. (Hyde Park) going Millennium Station
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 2 Mins
at . 1:15 ahead of Vehicle 324 Load 90%?
2: 39 - 45 Mins
at . 4:56 behind Vehicle 126 Load 327%?
ME Ground Level BoardingInbound and outbound trains may be loading from ground level at 75th, 83rd, 87th , 91st, 95th, 107th and 111th street stations. Please wait on the platform visible to the engineer and follow boarding instructions from the conductor after the train stops.
Add stop (different agency)