Agencies » Boston MBTA
• Framingham/Worcester Line
Affected direction: Outbound
Affected stops:
Readville
All gates at South Station are expected to be in service during the first week in January.
Jump to: →East
| ||||||||||||||||||||||||||||||||||||||
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.